Large-scale Residential Development relates to:
(a) the development of 100 or more houses;
(b) the development of student accommodation that includes 200 or more bed spaces;
(c) a combination of (a) and (b) where the threshold is met for either element and subject to the LRD floor space comprising the houses and/or student accommodation of the buildings being at least 70% of the total LRD floor space. The remaining 30% of the LRD floor space may be attributed to other uses.
The application procedures for an LRD planning application differ from a standard planning
application, and comprises 3 stages:
Stage 1: Pre-application Consultation Stage
- Section 247 Pre-application Consultation Meeting
- LRD Meeting
- LRD Opinion
Stage 2: Planning Application Stage
Stage 3: Appeal Stage (where applicable)
Application forms for LRD Pre-Application Consultation and Planning Application are available
below.
Documents
- Download the Large Scale Residential Developments Application Form (PDF, 270KB)
- Download the Large Scale Residential Developments Pre-Application Consultation Form (PDF, 215KB)
- Download Circular PL 13 2021 - Large-scale Residential Development Act and Regulations 2021
- Download the Office of the Planning Regulator's Planning Leaflet on Large Scale Residential Developments